Chim-chiminy...

Sitrep, Fairview stove install, 28-02-23. Pictured, me and Colin, rear elevation of our house, this afternoon. The chimney's now in place, along with the flexible flue-liner: shortly after the pic was taken, Colin made good the roof while I started bricking up the register plate at the base of the chimney, inside the loft. Another layer of stones tomorrow and some holes to be filled up there, then the two of us will finish the inside work on Friday; terminating the liner to the stove-pipe in the living room, followed by the smoke/draw testing. With a bit of luck, we should be lighting the stove for the first time on Saturday!


Comments

Popular posts from this blog

Of Feedback & Wobbles

Sister Ray

A Time of Connection