Rain Check, Part The Second

The 'L' Piece glued in place

 

I bought a small dowelling jig from the local Screwfix and jointed the 'L' piece onto the main board last afternoon. The dowels went in pretty accurately, to a tolerance between 1/64" and 1/32" top and bottom, but it served only to show how poor the beechblock panel really is. The machined end really isn't that accurate and the stability of the panel itself is a bit iffy, bowing ever so slightly with the atmospheric moisture. Still I've decided on a change of plan as to the location of the sink bowl which will probably get me out of jail and save a good bit of plumbing into the bargain. Back to it - more later...

Comments

Popular posts from this blog

Of Feedback & Wobbles

Sister Ray

A Time of Connection